Poland
Blasted rock & gravel
1 - 4 kilometers
Bolków S3
400 tons are detonated six times a day, making the tunnel two meters deeper. The material should be driven out as quickly as possible after the explosion. The BAS Mining tippers are used for this. The advantages for PORR: the highest possible loading capacity and therefore as few movements in and out of the tunnel as possible.