Profen, Germany
Overburden of browncoal mine
500 – 1500 meters (one-way)
17,5 litres/hour
Open pit mine Profen
(Saxony-Anhalt)
1.900 hours/year
Yes
The material has to be distributed evenly onto the conveyer belt to prevent misalignment of the binders. That’s why pushers are perfectly fit for this project. These trucks can unload evenly with a steady speed, which makes it possible to unload directly onto the conveyer belt.
The road conditions are heavy: 20-50% dragline mats and 50-80% peatland. The single mounted tyres are therefore perfect; they result in less ground pressure and load on the dragline mats.